South Jetty Partial Demolition

The scope of this project is limited to the collapsed/buckled area of the decking located on the South Jetty. Proposed work includes demolition of the collapsed concrete deck over a 155 foot span, including all longitudinal and traverse beams, associated reinforcing steel and mooring hardware and fender piles. The concrete shall be removed and legally disposed of in its entirety with the exception of an 23-foot section adjacent to the steel bulkhead, which is to remain. Additionally, the work includes the installation of 100 cubic yards of crushed stone to fill voids located inshore of the existing steel sheetpile bulkhead. The site will be secured with fencing at the conclusion of the project.
Interested parties may also obtain a hard copy set of the bid documents which are available at EDIC's Capital Construction Department, 22 Drydock Avenue, South Boston, MA 02210. A twenty-five ($25.00) dollar deposit is required for each set of bid documents and shall be in the form of a certified check, cashier's check or treasurer's check made payable to the EDIC

Type Bid
Status Awarded
Due Date 05/08/2014 12:00
Awarded Date
Awarded Company Coastal Marine Construction
Contract Value $335,524
Contact [email protected]
Documents
NameType
Planholders .csv
AD doc
South Jetty Partial Demolition pdf


RESPONDENTS
CompanySubmissionValue
McConnell Enterprises $481,984.00
Burnham Associates, Inc. $722,000.00
Coastal Marine Construction $335,524.00
S&R Corporation $392,500.00
MacKay Construction $433,333.00
Burnham Associations, Inc. $722,000.00
Fleming Brothers, Inc. $449,000.00
  $0.00