Contractor to provide all labor, materials, equipment and incidentals required to relocate the existing water shuttle floats and docks, including but not limited to; (1) removal of all existing mooring piles (selected piles will be reused), dismantling the main floats, ganways, bow loading dock and appurtenant fixtures (heated waiting shelters and signage, fabricating and installing new aluminum pipe railing closures at previous gangway openings and (2) relocating the gangways and floats into their new configuration, re-drilling and installing six (6) selected mooring piles, installing new chain, and PVC mooring connection, reinstalling appurtenant fixtures, and installing new aluminum railings and gangway wear plate. Photographic documentation of existing conditions prior to relocation shall be considered incidental to such work.