Contractor Pre-qualification and Bid for Caisson Recovery and Re-installation
Work includes: Raise the caisson and reset it in the proper position in the outsure seal for the Drydock. Dewater the Drydock.
For the list of prequalified contractors, download the document in Supplemental Material.